Sign in
← All bills
SB 320Just filedHealth care

Raises required backup power time at dialysis facilities from 24 to 72 hours

The short version · AI summary

End stage renal disease (dialysis) facilities that use the standard emergency plan would need fuel on site to run their generator for at least 72 hours instead of 24. As an alternative, a facility could keep an on-site battery-powered generator able to power the facility for at least 72 hours. Water storage rules stay at 24 hours. Facilities must update their emergency plans by December 1, 2027. The bill takes effect September 1, 2027.

What it means for you

If you or a family member gets dialysis, your clinic would need longer-lasting backup power during outages. Most people would not notice any change in daily life.

One email when it moves, at most one a day. Unsubscribe in one click from any email.

Bill Facts

SB 320 · Filed Nov 10, 2026
Who it affects
  • Dialysis (end stage renal disease) facilities
  • Patients who receive dialysis treatment
What changes
  • Dialysis facilities must keep enough fuel to run their backup generator for at least 72 hours, up from 24 hours.
  • A facility may instead keep an on-site battery-powered generator able to power it for at least 72 hours.
  • Facilities must update their emergency plans by December 1, 2027.
When it starts
September 1, 2027, if it becomes law
What it changes
3 tags, with the bill’s own words

What it changes

Each tag says one thing the bill changes, with the bill’s own words. A major tag reaches many people, a lot of money or a core right.

Adds rules for business

Minor

Triples the minimum fuel capacity for on-site generators at dialysis facilities from 24 to 72 hours, a stricter emergency-plan mandate on these private facilities.

Quoted from the bill text
an on-site fuel source Added text: with sufficient (End of added text) Deleted text: that contains enough (End of deleted text) fuel capacity to power the on-site generator for not less than Added text: 72 (End of added text) Deleted text: 24 (End of deleted text) hours

Adds rules for business

Minor

Sets a deadline requiring every dialysis facility to revise its emergency plan to meet the new power duration rules.

Quoted from the bill text
Not later than December 1, 2027, each end stage renal disease facility shall modify the facility's emergency contingency plan as necessary to comply

Filed before

The text is about 90% similar to SB2919 from 89R (did not pass).

Earlier bills with similar text
  • Similar to 89R SB2919 (died), 90% text match

This note comes from comparing the bill with earlier bills, not from a quote.

Reviewed by AI on Nov 12, 2026 · Reviewed text version I

How reviews work
  • The plain-words summaries and notes are written by AI, not by a person.
  • Every quote is checked against the bill, letter for letter, before it is shown. A note whose words cannot be found in the bill is dropped.
  • Editors may correct a summary, an area of life or a note.

Where it is now

A bill is filed first. Then it goes to a committee, a small group of lawmakers who study it. After that, the House and the Senate each vote.

  1. Step 1
    Filed
    A lawmaker turned the bill in.
    You are here.
  2. Step 2
    A committee studies it
    A small group of lawmakers studies the bill, holds a hearing and votes.
  3. Step 3
    One side votes
    The House or the Senate votes on the bill.
  4. Step 4
    The other side votes
    The other part votes too.
  5. Step 5
    The governor decides
    The governor signs the bill into law or vetoes it, which means says no.

The bill, word for word

This is the bill as filed. A bill that changes a law shows what it adds and what it removes.

The record

Bill text
Session
90th Legislature, regular session
Author
Borris Miles
Subjects
Disaster Preparedness & Relief, Health Care Providers, Health--Other Diseases & Medical Conditions, Utilities--Electric
Documents
None yet
Witnesses
None yet

What happened so far

Every official action on this bill, newest first.

  1. Nov 10, 2026
    Filed
  2. Nov 10, 2026
    Received by the Secretary of the Senate
SB 320: Raises required backup power time at dialysis facilities from 24 to 72 hours | 51capitol