90R2203 LRM-F By: Dean H.B. No. 949 A BILL TO BE ENTITLED AN ACT relating to requirements and preferences for purchasing construction materials produced in the United States and this state. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Chapter 2252, Government Code, is amended by adding Subchapter H to read as follows: Added text: SUBCHAPTER H. REQUIREMENTS AND PREFERENCES FOR DOMESTIC CONSTRUCTION MATERIALS (End of added text) Added text: Sec. 2252.231. DEFINITIONS. In this subchapter: (End of added text) Added text: (1) "Construction materials" means, if permanently incorporated into a public infrastructure project, iron, steel, manufactured products, concrete, cement, aggregates, glass, lumber, drywall, copper, aluminum, asphalt, plastics, and fiber-optic cable. (End of added text) Added text: (2) "Political subdivision" includes a county, a municipality, a municipal utility district, a water control and improvement district, a special utility district, and other types of water districts. (End of added text) Added text: (3) "Procuring entity" means a: (End of added text) Added text: (A) state agency; or (End of added text) Added text: (B) political subdivision. (End of added text) Added text: (4) "Produced in the United States" means: (End of added text) Added text: (A) with respect to iron and steel, all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States; (End of added text) Added text: (B) with respect to a manufactured product: (End of added text) Added text: (i) the product was manufactured in the United States; and (End of added text) Added text: (ii) the cost of the product's components that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all the product's components; and (End of added text) Added text: (C) with respect to a construction material other than iron, steel, or a manufactured product, all manufacturing processes for the material occurred in the United States. (End of added text) Added text: (5) "Public infrastructure project" means the construction, reconstruction, alteration, repair, maintenance, or improvement of any building, structure, or infrastructure by a procuring entity through a contract with another person. The term includes any: (End of added text) Added text: (A) road, highway, or bridge; (End of added text) Added text: (B) water, wastewater, or flood control facility; (End of added text) Added text: (C) public building or facility; (End of added text) Added text: (D) transit or rail facility, port, or airport; or (End of added text) Added text: (E) broadband, telecommunications, or utility infrastructure. (End of added text) Added text: (6) "State agency" has the meaning assigned by Section 2151.002. (End of added text) Added text: Sec. 2252.232. DUTY TO REQUIRE PURCHASE OF CONSTRUCTION MATERIALS PRODUCED IN UNITED STATES. Except as provided by Section 2252.235, for each public infrastructure project of a procuring entity with an estimated contract value of $1 million or more, the procuring entity shall require the bid documents provided to all bidders and the resulting contract to include a provision requiring any construction materials used in the project to be produced in the United States. (End of added text) Added text: Sec. 2252.233. POWER TO REQUIRE PURCHASE OF CONSTRUCTION MATERIALS PRODUCED IN UNITED STATES. For each public infrastructure project by a procuring entity with an estimated contract value of $1 million or less, the procuring entity may require the bid documents provided to all bidders and the resulting contract to include a provision requiring any construction materials used in the project to be produced in the United States. (End of added text) Added text: Sec. 2252.234. PREFERENCE FOR CONSTRUCTION MATERIALS PRODUCED IN TEXAS. (a) A state agency that as a procuring entity includes a contract provision under Section 2252.232 or 2252.233 shall also include a contract provision requiring the contractor to purchase products and materials in the manner provided by Section 2155.444. (End of added text) Added text: (b) A political subdivision that as a procuring entity includes a contract provision under Section 2252.232 or 2252.233 may also include the contract provision described by Subsection (a). (End of added text) Added text: Sec. 2252.235. DETERMINATION FOR EXEMPTION BASED ON NONAVAILABILITY, DELAY, OR COST. (a) Section 2252.232 does not apply to a public infrastructure project of a procuring entity if the procuring entity determines in writing that: (End of added text) Added text: (1) the construction materials needed for the public infrastructure project and produced in the United States are not: (End of added text) Added text: (A) reasonably available in sufficient quantities; or (End of added text) Added text: (B) of satisfactory quality; or (End of added text) Added text: (2) compliance with Section 2252.232 would: (End of added text) Added text: (A) materially delay the project schedule; or (End of added text) Added text: (B) result in unreasonable cost increases. (End of added text) Added text: (b) A determination under this section is not subject to public disclosure under Chapter 552. A procuring entity shall retain the reasoning for a determination under this section and provide the information to the comptroller for inclusion in the report required by Section 2252.239. (End of added text) Added text: Sec. 2252.236. EXEMPTIONS FOR DISASTER-RELATED AND FEDERALLY FUNDED PURCHASES. This subchapter does not apply to a contract: (End of added text) Added text: (1) entered into in response to a state of disaster declared under Chapter 418; or (End of added text) Added text: (2) involving federal funds. (End of added text) Added text: Sec. 2252.237. CONFLICT WITH OTHER STATE LAWS. To the extent of any conflict between this subchapter and another law of this state, including Subchapter G, the more stringent law controls. (End of added text) Added text: Sec. 2252.238. RULES. The comptroller shall adopt rules to administer this subchapter, including rules for ensuring contractor compliance. (End of added text) Added text: Sec. 2252.239. REPORT. (a) On or before September 1 of each year, the comptroller shall collect information from procuring entities on the purchase of construction materials under a public infrastructure project contract, including: (End of added text) Added text: (1) the source of the purchases; and (End of added text) Added text: (2) for a contract exempted from this subchapter under Section 2252.235, the reasoning supporting the exemption. (End of added text) Added text: (b) On or before December 1 of each year, the comptroller shall submit a summary report of the information collected under Subsection (a) to the legislature. (End of added text) SECTION 2. Not later than December 1, 2027, the comptroller shall adopt rules necessary to implement Subchapter H, Chapter 2252, Government Code, as added by this Act. SECTION 3. Subchapter H, Chapter 2252, Government Code, as added by this Act, applies only in relation to a contract for which the request for bids or proposals or other applicable expression of interest is made public on or after the effective date of this Act. SECTION 4. This Act takes effect September 1, 2027.
← Back to HB 949
HB 949 · Version I
Introduced
Dated Nov 9, 2026
Underlined: added by this bill. Struck through: removed by this bill. Plain words stay as they are.