Sign in
← Back to HB 502
HB 502 · Version I

Introduced

Dated Nov 9, 2026

90R4924 CMO-D

By: Garcia of Bexar H.B. No. 502

A BILL TO BE ENTITLED

AN ACT

relating to a study by the Railroad Commission of Texas of the feasibility of converting abandoned or inactive oil and gas wells in Bexar County to geothermal energy production.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1. DEFINITIONS. In this Act:
(1) "Commission" means the Railroad Commission of Texas.
(2) "Institution of higher education" has the meaning assigned by Section 61.003, Education Code.
(3) "State agency" means an agency, department, board, commission, or other entity in the executive, legislative, or judicial branch of state government.
SECTION 2. STUDY. (a) The commission shall conduct a study to determine the feasibility of converting abandoned or inactive oil and gas wells in Bexar County to geothermal energy production. The study must:
(1) assess the number and list the location of abandoned or inactive wells in Bexar County that might be technically and economically suitable for conversion to geothermal energy production;
(2) evaluate geological conditions, well depth, temperature, infrastructure, and other factors that may affect the geothermal viability of the wells described by Subdivision (1) of this subsection;
(3) estimate the cost of converting wells described by Subdivision (1) of this subsection and compare that to the cost of plugging or otherwise remediating those wells;
(4) evaluate potential uses for geothermal energy produced from converted wells, including electricity generation, direct-use heating and cooling, and other commercial applications;
(5) evaluate the impact of converting wells described by Subdivision (1) of this subsection on the environment and groundwater and consider safety, ownership, and liability concerns associated with conversion;
(6) identify statutory or regulatory barriers to converting wells described by Subdivision (1) of this subsection;
(7) identify public and private funding opportunities for demonstration projects relating to converting wells to geothermal energy production; and
(8) provide recommendations for:
(A) establishing a pilot program in Bexar County relating to converting wells described by Subdivision (1) of this subsection;
(B) potential locations for the pilot program described by Paragraph (A) of this subdivision; and
(C) relevant regulatory or legislative action.
(b) In conducting the study required under Subsection (a) of this section, the commission may partner with appropriate state agencies and research institutions, including an institution of higher education.
SECTION 3. REPORT. Not later than December 1, 2028, the commission shall prepare and submit to the legislature a written report of the findings of the study and the recommendations required under Section 2 of this Act.
SECTION 4. EXPIRATION. This Act expires January 1, 2029.
SECTION 5. EFFECTIVE DATE. This Act takes effect September 1, 2027.
HB 502 Version I | 51capitol