By: Guillen H.B. No. 302 A BILL TO BE ENTITLED AN ACT relating to procedural requirements for uranium mining area permits and associated production area authorizations. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 27.0513, Water Code, is amended to read as follows: Sec. 27.0513. AREA PERMITS AND PRODUCTION AREAS FOR URANIUM MINING. (a) The commission may issue Added text: an area (End of added text)Deleted text: a (End of deleted text)permit pursuant to Section 27.011 that authorizes the construction and operation of two or more similar injection wells within a specified area for mining of uranium. Added text: (a-1) (End of added text) An application for a new Added text: area (End of added text) permit issued pursuant to Section 27.011, a major amendment of such a permit, or a renewal of such a permit for mining of uranium is subject to the public notice requirements and opportunity for contested case hearing provided under Section 27.018. Added text: Not later than the 30th day after the date the commission determines the application for an area permit to be administratively complete, the commission shall mail notice of receipt of the application to: (End of added text) Added text: (1) the owners of the surface of: (End of added text) Added text: (A) the tract of land on which the existing or proposed permitted area is or will be located; and (End of added text) Added text: (B) the tracts of land adjacent to the land described by Paragraph (A); and (End of added text) Added text: (2) the owners of mineral rights underlying: (End of added text) Added text: (A) the tract of land on which the existing or proposed permitted area is or will be located; (End of added text) Added text: (B) the tracts of land adjacent to the land described by Paragraph (A); and (End of added text) Added text: (C) the territory of any groundwater conservation district established in the county in which the existing or proposed permitted area is or will be located. (End of added text) Added text: (a-2) (End of added text) A new, amended, or renewed Added text: area (End of added text) permit must incorporate a table of pre-mining low and high values representing the range of groundwater quality within the permit boundary and area of review, Added text: or other values acceptable to the commission, (End of added text)Deleted text: as provided by commission rule, (End of deleted text)for each water quality parameter used to measure groundwater restoration in a commission-required restoration table. The Added text: initial (End of added text) values in the permit range table must be established from pre-mining baseline wells and all available wells within the area of review, including those in the existing or proposed permit boundary and any existing or proposed production areas. Wells used for that purpose are limited to those that have documented completion depths and screened intervals that correspond to a uranium production zone aquifer identified within the permit boundary. (b) For Added text: an area (End of added text)Deleted text: a (End of deleted text)permit for mining of uranium issued on or after September 1, 2007, pursuant to Section 27.011, the term of the permit to authorize injection for recovery of uranium shall be 10 years.Deleted text: The holder of a permit for mining of uranium issued by the commission before September 1, 2007, pursuant to Section 27.011, must submit an application to the commission before September 1, 2012, for renewal of the permit to authorize construction and operation of injection wells for mining of uranium. (End of deleted text)Authority to construct or operate injection wells for recovery of uranium under a permit issued before September 1, 2007, pursuant to Section 27.011, expires on September 1, 2012, if an application for renewal of the permit is not submitted to the commission before September 1, 2012. Expiration of authority under this subsection does not relieve the permit holder from obligations under the permit or applicable rules, including obligations to restore groundwater and to plug and abandon wells in accordance with the requirements of the permit and applicable rules. (c) The commission may issue a holder of Added text: an area (End of added text)Deleted text: a (End of deleted text)permit Added text: for mining of uranium (End of added text) issued pursuant to Section 27.011 Added text: a production area (End of added text)Deleted text: for mining of uranium an (End of deleted text)authorization that allows the permit holder to conduct mining and restoration activities in production zones within the boundary established in the Added text: area (End of added text) permit. Added text: A production area authorization is not subject to the notice and hearing requirements described by Subsection (a-1), and the authorization is limited to staff administrative review and approval, if the production area is compliant with the technical and restoration requirements established under Subsection (c-1). (End of added text) Added text: (c-1) (End of added text) The commissionDeleted text: by rule (End of deleted text)shall establish application requirements, technical requirements, including the methods for determining restoration table values, and procedural requirements for Added text: a production area authorized in the boundaries of an area permit (End of added text)Deleted text: any authorization (End of deleted text). If a restoration table value for a proposed or amended Added text: authorized production area (End of added text)Deleted text: authorization (End of deleted text)exceeds the range listed in the Added text: area (End of added text) permit range table such that it falls above the upper limit of the range, the value within the Added text: area (End of added text) permit range table must be used or a major amendment to the Added text: area (End of added text) permit range table must be obtained, subject to an opportunity for a contested case hearingDeleted text: or the hearing requirements of Chapter 2001, Government Code (End of deleted text). Added text: (c-2) (End of added text)Deleted text: (c-1) (End of deleted text)The commission shall prioritize the conservation of regional groundwater water supplies when reviewing an application to amend a restoration tableDeleted text: value (End of deleted text). (d) Notwithstanding Sections 5.551, 5.556, 27.011, and 27.018, an application for Added text: a production area (End of added text)Deleted text: an (End of deleted text)authorization or an amendment to Added text: a production area (End of added text)Deleted text: an (End of deleted text)authorization that allows theDeleted text: permit (End of deleted text)holder Added text: of an area permit (End of added text) to conduct mining and restoration activitiesDeleted text: in production areas (End of deleted text)within the boundary established in the permit is an uncontested matter not subject to a contested case hearing or the hearing requirements of Chapter 2001, Government Code, if: (1) the authorization is for a production area located within the boundary of Added text: the (End of added text)Deleted text: a (End of deleted text)permit that incorporatesDeleted text: , for each production area addressed in the application, (End of deleted text)a range table of groundwater quality restoration values used to measure groundwater restoration by the commission; (2) the Added text: authorization (End of added text)Deleted text: application (End of deleted text)includesDeleted text: , for each production area addressed in the application, (End of deleted text)groundwater quality restoration values falling at or below the upper limit of the range established in Subdivision (1); Added text: and (End of added text) (3) the authorization is for a production area located within the boundary of Added text: the (End of added text)Deleted text: a (End of deleted text)permit that incorporates groundwater baseline characteristics of the wells Added text: as (End of added text)Deleted text: for the application (End of deleted text)required by commission ruleDeleted text: ; and (End of deleted text)Deleted text: (4) not later than the 30th day after the date the commission determines the application to be administratively complete, the commission mails notice of receipt of the application to: (End of deleted text)Deleted text: (A) the owners of the surface of: (End of deleted text)Deleted text: (i) the tract of land on which the existing or proposed production area is or will be located; and (End of deleted text)Deleted text: (ii) the tracts of land adjacent to the land described by Subparagraph (i); (End of deleted text)Deleted text: (B) the owners of mineral rights underlying: (End of deleted text)Deleted text: (i) the tract of land on which the existing or proposed production area is or will be located; and (End of deleted text)Deleted text: (ii) the tracts of land adjacent to the land described by Subparagraph (i); and (End of deleted text)Deleted text: (C) any groundwater conservation district established in the county in which the existing or proposed production area is or will be located (End of deleted text). (e) Added text: An amendment in the (End of added text)Deleted text: The (End of deleted text)range of restoration values in the range table used for Subsection Added text: (c-1) may (End of added text)Deleted text: (d) must (End of deleted text)be established from baseline wells and all available well sample data collected in the Added text: area (End of added text) permit boundary and within one-quarter mile of the boundary of the production zone Added text: or from other values proposed by the applicant and approved by the commission (End of added text). SECTION 2. The change in law made by this Act applies only to an application for an area permit or a production area authorization or an amendment to a permit or authorization that is submitted to the Texas Commission on Environmental Quality on or after the effective date of this Act. An application for an area permit or a production area authorization or an amendment to a permit or authorization that was submitted to the commission before the effective date of this Act is governed by the law in effect at the time the application or amendment was submitted, and the former law is continued in effect for that purpose. SECTION 3. This Act takes effect September 1, 2027.
← Back to HB 302
HB 302 · Version I
Introduced
Dated Nov 10, 2026
Underlined: added by this bill. Struck through: removed by this bill. Plain words stay as they are.